Article
31 January 2015
Published
IGI Global
10.4018/ij3dim.2015010104
2156-1710
TH Building construction
692 Auxiliary construction practices
Patlakas, P., Menendez, J., & Hairstans, R. (2015). The Potential, Requirements, and Limitations of BIM for Offsite Timber Construction. International journal of 3-D information modeling, 4(1), 54-70. https://doi.org/10.4018/ij3dim.2015010104
School of Engineering and The Built Environment
ProfessorSchool of Computing Engineering and the Built Environment
0131 455 2891
R.Hairstans@napier.ac.uk
Offsite timber construction; Building Information Modelling (BIM); fabrication; pre-assembly;
1MB